Sprinkler Winterization & Blowouts in Clinton Township, MI
I winterize across Clinton Township—subs off Hall Rd (M-59), Garfield, Hayes, Romeo Plank, Canal Rd, and Metro Pkwy/16 Mile, plus neighborhoods near Partridge Creek. My process is the same on every job: 50–60 PSI with high CFM, short passes per zone, and I leave the drain plug off or partially threaded so any weeping main shut-off drains out instead of back into your system.
Service focus: Hall Rd (M-59) • Garfield • Hayes • Romeo Plank • Canal Rd • Metro Pkwy/16 Mile • Moravian • Near The Mall at Partridge Creek • ZIPs 48035, 48036, 48038
Pricing
Contact us for current pricing.
How I Winterize (Button View)
1
Shut off & inspect
Supply, backflow, drains/low points, zone order
2
Safe hookup
Downstream of backflow; 50–60 PSI + high CFM
3
Short zone passes
Farthest first; ~60–120s to fine mist
4
Backflow & drains
Purge cocks; drain plug off/part-threaded
5
Controller
City-water can stay ON; pump-start disabled
6
Paper report
Leave Winterizing Report + text notes
Important: Winterization is not a full inspection (air won’t reveal everything the way water does). If you notice continuous weeping at the drain after 24–72 hours, call; otherwise I’ll see you at spring start-up.
Local Notes for Clinton Township
- Main corridors: Hall Rd (M-59) • Garfield • Hayes • Romeo Plank • Canal Rd • Metro Pkwy/16 Mile • Moravian.
- Landmarks/areas: The Mall at Partridge Creek • canal-side lots off Canal Rd • near the Clinton River.
Mini Case Study
12-zone near Hall Rd & Romeo Plank with long back runs that held water. Two short passes at 50–60 PSI with high CFM; drain plug partially threaded; 48-hour check—dry; spring start-up was clean.
Nearby Areas
Sterling Heights • Macomb Township • Warren • All Service Areas