United Sprinklers – Sprinkler Winterization Near Me

Sprinkler Winterization & Blowouts in Clinton Township, MI

I winterize across Clinton Township—subs off Hall Rd (M-59), Garfield, Hayes, Romeo Plank, Canal Rd, and Metro Pkwy/16 Mile, plus neighborhoods near Partridge Creek. My process is the same on every job: 50–60 PSI with high CFM, short passes per zone, and I leave the drain plug off or partially threaded so any weeping main shut-off drains out instead of back into your system.

Service focus: Hall Rd (M-59) • Garfield • Hayes • Romeo Plank • Canal Rd • Metro Pkwy/16 Mile • Moravian • Near The Mall at Partridge Creek • ZIPs 48035, 48036, 48038

Pricing — Clinton Township

City Water — Cash/Check/Zelle

8z $75 • 10z $85 • 12z $95 • 14z $105 • 16z $115 • 18z $125 • 20z $135 • 22z $145

City Water — Online Payment

8z $85 • 10z $95 • 12z $105 • 14z $115 • 16z $125 • 18z $135 • 20z $145 • 22z $155

Pump/Lake/Well — Cash/Check/Zelle

10z $125 • 12z $135 • 14z $145 • 16z $155 • 18z $165 • 20z $175 • 22z $185 • 24z $195

Pump/Lake/Well — Online Payment

10z $135 • 12z $145 • 14z $155 • 16z $165 • 18z $175 • 20z $185 • 22z $195

Add-on (when required): Pull & disconnect lake intake pipe: $125.

How I Winterize (Button View)

1 Shut off & inspect Supply, backflow, drains/low points, zone order 2 Safe hookup Downstream of backflow; 50–60 PSI + high CFM 3 Short zone passes Farthest first; ~60–120s to fine mist 4 Backflow & drains Purge cocks; drain plug off/part-threaded 5 Controller City-water can stay ON; pump-start disabled 6 Paper report Leave Winterizing Report + text notes
Important: Winterization is not a full inspection (air won’t reveal everything the way water does). If you notice continuous weeping at the drain after 24–72 hours, call; otherwise I’ll see you at spring start-up.

Local Notes for Clinton Township

  • Main corridors: Hall Rd (M-59) • Garfield • Hayes • Romeo Plank • Canal Rd • Metro Pkwy/16 Mile • Moravian.
  • Landmarks/areas: The Mall at Partridge Creek • canal-side lots off Canal Rd • near the Clinton River.

Mini Case Study

12-zone near Hall Rd & Romeo Plank with long back runs that held water. Two short passes at 50–60 PSI with high CFM; drain plug partially threaded; 48-hour check—dry; spring start-up was clean.

Nearby Areas

Sterling HeightsMacomb TownshipWarrenAll Service Areas

Back to Top